Est. 2018 · GOLDEN CO FOUNDATION CONTRACTOR

Golden's new-construction foundation specialists

Poured walls, footings, slabs, ADU foundations, and pier foundations — engineered to spec, poured to code, and ready for the framer.

Fully insured · GL & workers' comp
Engineered to spec · Pours follow the structural set
On-time pour windows · Framers stay on calendar
Code-compliant · Inspections coordinated

The Denver Foundations standard

Built for Front Range soil — and your build schedule

We pour to the structural drawings and the soils report, not a generic detail. Pour windows are real, embeds are set to template, and inspections are coordinated so the framer is never waiting on us.

  • Written scopes tied to the structural set
  • Workmanship warranty on every pour
  • Cold-weather and hot-weather cure protocols

Service Areas

Cities We Serve

Our crews work across the greater Golden area. Click your city for local service pages.

Portfolio

Recent pours

New-construction walls, slabs, ADU foundations, and pier foundations across the Front Range — documented from dig to handoff.

Full basement walls + footings
Custom home

Full basement walls + footings

Engineered formwork, monolithic pour, inspection sign-off in one day

Backyard ADU stem wall
ADU

Backyard ADU stem wall

Tight-access dig, pump-truck pour, neighbor-friendly schedule

Post-tension slab
Production build

Post-tension slab

Cable layout, stressed on engineer schedule, framer-ready

Builder voices

What GCs say after the pour

"Walls came out plumb, anchors were exactly on template, and the inspection passed first time. That is what we pay for."
Project managerCustom home builder
"Post-tension slab, cold-weather pour, blanketed and cured by the book. Stressed on schedule. Clean handoff."
SuperintendentProduction builder

How it works

From structural set to framer-ready

  1. 01

    Send the drawings

    We review the structural set, the soils report, and the target framing date. We share what is realistic and the next step.

  2. 02

    Walk the lot

    We confirm access, dig conditions, and pour-route logistics — then return a written scope and pour window.

  3. 03

    Dig, form, and place rebar

    Excavation to engineered depth, formwork set true, rebar tied to spec, embeds set to template before the pour.

  4. 04

    Pour, cure, hand off

    Consolidated pour, documented cure, inspection sign-off, and a clean handoff to the framer.

Get started

Request a quote

Share the structural set, the soils report, and your target framing date. We will reply within one business day with next steps.

Email quotes@goldenfoundationco.com

Office hours Mon–Fri 7:00a–5:00p · Pour days as scheduled

Service area Denver metro & the Front Range

Find us